Anchor Windlass and Mooring Winch overhauling: INS-JYOTHI

  • Dismantled
  • Cleaned
  • Gauged
  • Overhauled
  • Assembled
  • Load Tested
  • Commissioning

Hydraulic System pipelines: INS-JYOTHI

  • Removal of Hydraulic system pipelines
  • Chemical cleaning the pipe and flanges
  • Renew the damaged flanges and pipes
  • Refit the Hydraulic System pipelines
  • Pressure tested the pipeline
  • Flushing

Indian coast guard off shore patrol vessels

  • Copper-nickel and CS Pipe line fabrication and erection